This project involved the construction of new open plan office accommodation at mezzanine level over an existing Tool room and Machine Build Facility. The project included the development of two new stair access points to mezzanine level and passenger lift installation. The work was undertaken over an existing live working area throughout the project, as well as being adjacent to an internal personnel corridor.
Client:
Boston Scientific
Project:
Boston Scientific Tool Room & Machine Area Mezzanine
Architect:
PM Group
Valuation:
€700,000