The project consisted of the upgrade of Unit Dose 10 room and Labelling area; the refurbishment of Clean Corridor; and the installation of new Unit Dose 10 manufacturing equipment. Also included in the project was the demolition of existing female changing/locker area and mezzanine stairs, as well as the construction and fit-out of new female facilities and alterations to existing male changing area. The work was carried out adjacent to an operational manufacturing and packaging area of the plant and required extensive access and protection to overhead void and extension to gantry access areas.
MJ Conroy Triumphs at the 2024 Irish Construction Excellence Awards
MJ Conroy is delighted to announce that we have been honoured with two prestigious awards at the 2024 Irish Construction Excellence (ICE) Awards. The gala