Allergan CBPA AUTOMATION

The project  involved extensive refurbishment both inside and outside the existing Botox Building at Allergan Pharmaceuticals. It involved the removal and replacement of internal doors, demolition and removal and replacement of existing suspended ceilings with new plasterboard ceiling. New internal partition walls installed and a new floor finish in the work area. Along with alterations made to some existing laboratory furniture and new laboratory equipment. There was a new AHU installed and commissioned and some existing sheet cladding replaced externally.

Client:
Allergan Pharmaceuticals, Ireland Ltd.

Project:
Allergan CBPA Automation

Architect:
Taylor Architects

Valuation:
€555,000.00